Toyota Corolla

1992-1998 of release

Repair and car operation



Toyota Corolla
+ 1. Maintenance instruction
+ 2. Maintenance
- 3. Engines
   - 3.1. Petrol engines
      - 3.1.1. Repair work without engine dismantle from the car
         3.1.1.1. Specifications
         3.1.1.2. Installation of the piston of the 1st cylinder in MWT of a step of compression
         3.1.1.3. Cover of a head of the block of cylinders
         3.1.1.4. A soaking-up collector
         3.1.1.5. Final collector
         3.1.1.6. Gear belt
         3.1.1.7. Forward epiploon of the crankshaft
         3.1.1.8. Cam-shaft epiploon
         3.1.1.9. Cam-shafts and pushers (engines of 1,3 l)
         3.1.1.10. Cam-shafts and pushers (l engines 1,6 and 1,8)
         3.1.1.11. Head of the block of cylinders
         3.1.1.12. Oil pallet
         3.1.1.13. Oil pump
         3.1.1.14. Flywheel (or leading disk of the hydrotransformer)
         3.1.1.15. Back epiploon of the crankshaft
         3.1.1.16. Engine mount details
      + 3.1.2. Dismantle and major maintenance
   + 3.2. Diesel engine
   + 3.3. Engine electric equipment
+ 4. Systems of cooling, heating
+ 5. Fuel, exhaust systems
+ 6. System of decrease in toxicity
+ 7. Transmissions
+ 8. Coupling and semi-axes
+ 9. Brake system
+ 10. Suspension bracket and steering
+ 11. Body
+ 12. Electric equipment



3.1.1.5. Final collector

GENERAL INFORMATION

Prevention

Works are carried out on the cold engine.


Removal

PERFORMANCE ORDER
1. Disconnect the battery from weight.
2. Unscrew five bolts of fastening (are specified by shooters) and remove from a collector the top heatinsulating screen.

Prevention

The design provided also the bottom screen which is attached to a collector from below and to remove it there is no need.


3. Moisten nuts and bolts of a final collector and a nut of fastening of an exhaust pipe to a collector with getting liquid. After wetting unscrew nuts of fastening of an exhaust pipe.

4. Unscrew the top bolt (the top arrow) fastenings of a rack of a final collector bolts of fastening of a rack of a collector (if it is provided by a design). Weaken an inhaling of two bolts of fastening of a rack of a collector to the block of cylinders (the bottom shooters).

5. Unscrew nuts and bolts of fastening and remove a collector together with laying.

Installation

PERFORMANCE ORDER
1. To Soskrebita from demountable surfaces of a collector and a head of cylinders all remains of a material of laying and deposit adjournment. If leak signs through laying are observed, check deformation of the demountable plane of a collector in a specialized workshop, if necessary прошлифуйте.
2. Put on hairpins of fastening of a collector to a head of cylinders new laying. Labels on laying should be turned aside from a head of cylinders, and the arrow should indicate towards transmission.
3. Establish a final collector and wrap bolts and nuts on former places.
4. Tighten nuts and bolts in three-four receptions with the set moment (it is specified in subsection 3.1.1.1). Tighten bolts and nuts from the center to the collector periphery.
5. Establish other details as it should be, the return to dismantling.
6. Start the engine and check tightness of connections of a final collector.